The rapid growth of the industry is due to both investor interest and phenomenal successes in the design of Wind energy projects financing, turbines and an increase in the capacity of generators.
One of the benefits wind power projects financing remains a fast driven energy production is the predictability of energy costs. In addition to economic benefits, wind farms are helping to make energy production more environmentally friendly.
Wind energy projects financing are guided by the requirements of profitability and sustainability.
Wind power is developing rapidly in Europe and around the world.
Over the past 5 years, wind power accounts for more than one third of all installed generators in the world.
Viola Funding Limited provides clients with affordable financing for related power and wind energy projects for many years.
The construction and launch of a wind power plant, as a rule, takes from 6 to 18 months, depending on the size of the project, the terrain, the difficulties of connecting to the distribution grid, as well as the delivery and installation of turbines.
The construction and launch of a wind power plant, as a rule, takes from 6 to 18 months, depending on the size of the project, the terrain, the difficulties of connecting to the distribution grid, as well as the delivery and installation of turbines.
Viola funding offers long-term lending and implementation of wind energy projects financing. Our financing is affordable with a flexible terms.
Financing of wind farms is the main areas of our work.
Want to learn more about new investment opportunities?
Contact our representative.
We are financing wind energy investment projects around the world.
Many entrepreneurs have ideas and even suitable sites for the construction of a wind farm, but there are no available funds for the implementation of the project.
Wind power plant construction step by step
The construction phase of wind energy begins with engineering. In the design of wind farms, the results of topographic surveys are used to determine the characteristics of elevations and soil. Specialists also use geotechnical survey data and soil resistivity tests for the electrical grounding system.
This information affects the location of key elements such as a wind turbine, transformer and high voltage substation. After determining the location of the main elements, engineers can calculate the distribution of electricity and plan cable routes.
In addition to careful monitoring and reporting at each stage of work, we stay in touch with the investor in order to make adjustments to the approved project if necessary. After installing the equipment, engineers organize the testing and commissioning of a wind turbine.
Wind power plant construction requires experience in engineering, electrical engineering, architecture, logistics, and project management. You need a team of highly qualified professionals.
Wind energy project financing: construction step by step
To deliver to the place, install, and connect this equipment to the electric grid, you will need large-scale construction project. One of the first steps in the construction process is the clearing of the territory and the arrangement of gravel access roads. Access roads are built from existing public roads to the construction site to provide access to equipment for construction, ongoing operation and maintenance.
The wind turbine consists of four main parts: foundation, tower, gondola and rotor with blades.
The rotor converts wind energy into rotational motion. The gondola contains an electric generator and other components that convert the mechanical rotation of the rotor into electricity. The tower supports the gondola and rotor on a reinforced concrete foundation.
This whole structure, generating power from several hundred kilowatts to almost 8 megawatts, reaches 120 meters in height and has a rotor diameter of up to 150 meters. The weight of a modern wind generator can reach several thousand tons.
Temporary access roads are being built in a corridor about 12-15 meters wide. Before laying the gravel, the topsoil is removed, the soil is compacted and a heavy-duty coating is laid. After the construction is completed, access roads are converted into permanent roads about 5 meters wide.
The wind power plant has a numerous underground electrical cables that run from each turbine to the grid. Requirements for trenches for laying cables, including the minimum depth, varies depending on your national standards and the features of the project.
Modernization, operation and maintenance of wind farms
Wind farm maintenance is any process aimed at maintaining wind turbines in good working order. Maintenance includes regular lubrication of moving parts (gears, bearings), checking the connection inside the systems, urgent solution of technical problems and setting up equipment.
When the wind turbine requires maintenance, we appoint a responsible specialist and immediately resolve the issue.
Proper operation and maintenance (O&M) maximizes wind turbine performance and extends its life.
Currently, the operation and maintenance of wind farms costs tens of thousands of euros per megawatt.
For example, in the United States, the average annual O&M cost exceeds $ 50,000 per MW and grows by 3-5% per year.
When the wind turbine requires maintenance, we appoint a responsible specialist and immediately resolve the issue.
We take care of the owner, offering personalized financial and technical solutions with optimal cost for wind energy projects financing.
Do you need project financing?Providing basic project finance services, we can assist your project from the technical side by recommending our reliable partners in the form of engineering companies.
We offer the most advanced tools for the implementation of your investment project, from a feasibility study to construction.